Forum Title: general thouhgts on control joints in garages
I have a builder that wants control joints in the garage. I have only done them once before. I told my hanger to leave the joint, and I installed that bead. The builder told me he thought it should be done differently. The garage was 36 wide by 24 deep. We ran three 12's in 6 rows, with the butt joints running in a line and the 2 control joits in place of the running butt joints. Builder thought we should do three rows of the 12's and then a control joint in the recessed joint the whole 36 ft, and then the other 3 rows. I'd rather get rid of the but joints. Any thoughts?
Category: Drywall Post By: RICHARD DAVIS (Kennewick, WA), 02/02/2018